Skip to content
Whole-Home

Whole-Home Transformation & Second-Story Build

A full-house transformation: the home was taken back to sheathing and framing, a second story was built and insulated, and the interior was finished throughout — new stair hall, hardwood floors, millwork, and two fully tiled bathrooms.

Home stripped to sheathing during the exterior phase
Completed interior stair hall after the whole-home renovation
BeforeAfter
  • Exterior stripped to sheathing with taped seams before new siding
  • Second-story framing wrapped in house wrap with scaffolding in place
  • New second-story interior framed and spray-foam insulated
  • Upstairs hallway after drywall installation
  • Two-story stair hall with hardwood floors and new chandelier
  • Upstairs landing with wainscot paneling and oak flooring
  • Guest bathroom with subway tile, brass fixtures and penny-round floor tile
  • Primary bathroom with freestanding tub, marble tile and glass shower
  • Primary bathroom marble vanity with gilded mirrors and brass sconces

Scope of work

  • Exterior tear-off, sheathing and weather barrier

  • Second-story framing, roof and window installation

  • Spray-foam insulation and drywall throughout

  • Open stair hall with new railings and wainscot millwork

  • Hardwood flooring, trim and paint

  • Two full bathroom builds — marble and tile finishes

Planning something similar?

Share the details of your project and we will walk you through how it is approached.